---
title: "Target OEE losses on critical assets"
description: "When choosing the next focused-improvement project, I want OEE's six losses broken out per critical asset, so I can pick the speed, quality or availability…"
author: Mapped
license: https://creativecommons.org/licenses/by/4.0/
canonical: https://rivet.mapped.com/personas/job/manufacturing/continuous-improvement-lean-manager/target-oee-losses-on-critical-assets
---

# Target OEE losses on critical assets

Job to be done · Continuous Improvement / Lean / OpEx Manager

In [Throughput](https://rivet.mapped.com/personas/category/throughput) · for the [Continuous Improvement / Lean / OpEx Manager](https://rivet.mapped.com/personas/role/manufacturing/continuous-improvement-lean-manager) in [Manufacturing plants and industrial sites](https://rivet.mapped.com/personas/facility/manufacturing)

> When choosing the next focused-improvement project, I want OEE's six losses broken out per critical asset, so I can pick the speed, quality or availability loss that pays rather than the one that is loudest.

## Apps that fit

Board · Report

## Measured by

- six-loss breakdown per asset
- OEE on focus assets

## What an app needs to see

- machine run-state, speed and counts
- scrap/rework per asset
- downtime reason codes

## Pain points

- OEE was designed 'to measure the reliability of a specific asset or piece of equipment', not whole plants (Accendo)
- OEE 'should not be used to compare machines or benchmark' (Wikipedia)

## Who else wants this

### Cross-cutting and portfolio roles

- Digital Twin / BIM Manager (owner-side): [Get usable asset data at handover](https://rivet.mapped.com/personas/job/cross-cutting/digital-twin-bim-manager/get-usable-asset-data-at-handover)
- Energy & Sustainability Director: [Prove savings after projects](https://rivet.mapped.com/personas/job/cross-cutting/energy-sustainability-director/prove-savings-after-projects)
- Portfolio / Regional Facilities Director: [Plan regional capital from condition](https://rivet.mapped.com/personas/job/cross-cutting/portfolio-regional-facilities-director/plan-regional-capital-from-condition)
- Reliability Engineer (facilities): [Get failure data good enough to analyse](https://rivet.mapped.com/personas/job/cross-cutting/reliability-engineer-facilities/get-failure-data-good-enough-to-analyse)

### Data center

- Vice President, Data Center Operations: [See portfolio risk before the outage](https://rivet.mapped.com/personas/job/data-center/vp-data-center-operations/see-portfolio-risk-before-the-outage)
- Director of Operations Engineering: [Run fleet wide reliability programs](https://rivet.mapped.com/personas/job/data-center/director-operations-engineering/run-fleet-wide-reliability-programs)
- NOC / BMS Operator (Critical Facilities Control Room): [Turn critical alarms into tickets in 60 seconds](https://rivet.mapped.com/personas/job/data-center/noc-bms-operator/turn-critical-alarms-into-tickets-in-60-seconds)

### Manufacturing plants and industrial sites

- Director of Manufacturing Operations / VP Operations: [Judge reactive vs planned maintenance trend](https://rivet.mapped.com/personas/job/manufacturing/director-of-manufacturing-operations/judge-reactive-vs-planned-maintenance-trend)

## Sources

- [Wikipedia: Total productive maintenance](https://en.wikipedia.org/wiki/Total_productive_maintenance)
- [Accendo Reliability: 10 things a reliability engineer can do today (Doug Plucknette)](https://accendoreliability.com/10-things-reliability-engineer-can-today-improve-reliability/)
- [Wikipedia: Overall equipment effectiveness](https://en.wikipedia.org/wiki/Overall_equipment_effectiveness)

## More jobs for the Continuous Improvement / Lean / OpEx Manager

[Make tier boards live and honest](https://rivet.mapped.com/personas/job/manufacturing/continuous-improvement-lean-manager/make-tier-boards-live-and-honest) · [Prove a kaizen stuck](https://rivet.mapped.com/personas/job/manufacturing/continuous-improvement-lean-manager/prove-a-kaizen-stuck) · [Run tpm operator care with evidence](https://rivet.mapped.com/personas/job/manufacturing/continuous-improvement-lean-manager/run-tpm-operator-care-with-evidence)

## Every kind of facility

[Airports](https://rivet.mapped.com/personas/facility/airport) · [Cross-cutting and portfolio roles](https://rivet.mapped.com/personas/facility/cross-cutting) · [Data center](https://rivet.mapped.com/personas/facility/data-center) · [Education campuses](https://rivet.mapped.com/personas/facility/education) · [Government, civic and public-safety buildings](https://rivet.mapped.com/personas/facility/government-civic) · [Hospitals and healthcare facilities](https://rivet.mapped.com/personas/facility/healthcare) · [Laboratories and life-science facilities](https://rivet.mapped.com/personas/facility/laboratory) · [Manufacturing plants and industrial sites](https://rivet.mapped.com/personas/facility/manufacturing) · [Multifamily residential and rental housing](https://rivet.mapped.com/personas/facility/multifamily-residential) · [Office buildings and corporate workplaces](https://rivet.mapped.com/personas/facility/office) · [Retail, hospitality and venues](https://rivet.mapped.com/personas/facility/retail-hospitality) · [Transit, terminals and parking](https://rivet.mapped.com/personas/facility/transit-parking) · [Utilities and critical process infrastructure](https://rivet.mapped.com/personas/facility/utilities-infrastructure) · [Warehouses and distribution centers](https://rivet.mapped.com/personas/facility/warehouse)

## Every job category

[Uptime](https://rivet.mapped.com/personas/category/uptime) · [Maintenance](https://rivet.mapped.com/personas/category/maintenance) · [Energy](https://rivet.mapped.com/personas/category/energy) · [Sustainability](https://rivet.mapped.com/personas/category/sustainability) · [Safety](https://rivet.mapped.com/personas/category/safety) · [Compliance](https://rivet.mapped.com/personas/category/compliance) · [Security](https://rivet.mapped.com/personas/category/security) · [Space](https://rivet.mapped.com/personas/category/space) · [Occupancy](https://rivet.mapped.com/personas/category/occupancy) · [Experience](https://rivet.mapped.com/personas/category/experience) · [Cost](https://rivet.mapped.com/personas/category/cost) · [Capital planning](https://rivet.mapped.com/personas/category/capital_planning) · [Workforce](https://rivet.mapped.com/personas/category/workforce) · [Vendor](https://rivet.mapped.com/personas/category/vendor) · [Throughput](https://rivet.mapped.com/personas/category/throughput) · [Quality](https://rivet.mapped.com/personas/category/quality) · [Customer](https://rivet.mapped.com/personas/category/customer) · [IT and OT](https://rivet.mapped.com/personas/category/it_ot) · [Cleaning](https://rivet.mapped.com/personas/category/cleaning) · [Resilience](https://rivet.mapped.com/personas/category/resilience)

---

From [PersonaDB](https://rivet.mapped.com/personas), Mapped’s directory of who works in a facility and what they’re trying to get done, free to reuse under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/) with credit to Mapped. Page: https://rivet.mapped.com/personas/job/manufacturing/continuous-improvement-lean-manager/target-oee-losses-on-critical-assets
