---
title: "Stay compliant on LOTO and electrical safety"
description: "When OSHA or corporate audits, I want every machine's LOTO procedure, annual inspection and authorized-employee training current and the arc-flash labels…"
author: Mapped
license: https://creativecommons.org/licenses/by/4.0/
canonical: https://rivet.mapped.com/personas/job/manufacturing/maintenance-manager/stay-compliant-on-loto-and-electrical-safety
---

# Stay compliant on LOTO and electrical safety

Job to be done · Maintenance Manager

In [Compliance](https://rivet.mapped.com/personas/category/compliance) · for the [Maintenance Manager](https://rivet.mapped.com/personas/role/manufacturing/maintenance-manager) in [Manufacturing plants and industrial sites](https://rivet.mapped.com/personas/facility/manufacturing)

> When OSHA or corporate audits, I want every machine's LOTO procedure, annual inspection and authorized-employee training current and the arc-flash labels matching the plant as it runs, so I can show certification records rather than scramble.

## Apps that fit

Checklist · Report · Alerts

## Measured by

- LOTO procedures inspected in last 12 months %
- authorized employees trained %
- arc-flash study age

## What an app needs to see

- asset list with energy sources
- LOTO procedure and inspection dates
- training records
- single-line diagram change log

## Pain points

- Employer 'shall conduct a periodic inspection of the energy control procedure at least annually' and certify it (OSHA)
- 'Arc-flash labels usually lose reliability through ordinary plant activity, not obvious neglect.' (Plant Engineering)
- 'Without assigned ownership, verify the label becomes a slogan instead of a control.' (Plant Engineering)

## Who else wants this

### Data center

- Commissioning Manager / Commissioning Agent: [Hand over a site operations can run](https://rivet.mapped.com/personas/job/data-center/commissioning-manager-agent/hand-over-a-site-operations-can-run)
- Critical Facilities Manager: [Close audit and documentation gaps](https://rivet.mapped.com/personas/job/data-center/critical-facilities-manager/close-audit-and-documentation-gaps)
- Director of Data Center Operations: [Standardize procedures across sites](https://rivet.mapped.com/personas/job/data-center/director-data-center-operations/standardize-procedures-across-sites)

### Government, civic and public-safety buildings

- Custodial Supervisor: [Keep chemicals and equipment safe](https://rivet.mapped.com/personas/job/government-civic/custodial-supervisor/keep-chemicals-and-equipment-safe)

### Manufacturing plants and industrial sites

- EHS Manager / Safety Coordinator: [Run LOTO machine guarding and forklift programs](https://rivet.mapped.com/personas/job/manufacturing/ehs-manager/run-loto-machine-guarding-and-forklift-programs)
- Maintenance Technician (Mechanical / Multi-craft): [Work safely under lockout](https://rivet.mapped.com/personas/job/manufacturing/maintenance-technician/work-safely-under-lockout)

### Warehouses and distribution centers

- Cold Chain / Quality Assurance Manager: [Be audit ready for SQF and customers](https://rivet.mapped.com/personas/job/warehouse/cold-chain-quality-assurance-manager/be-audit-ready-for-sqf-and-customers)
- General Manager (Site Leader): [Be ready for an osha inspection](https://rivet.mapped.com/personas/job/warehouse/general-manager-site-leader/be-ready-for-an-osha-inspection)

## Sources

- [OSHA 29 CFR 1910.147 The control of hazardous energy (lockout/tagout)](https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.147)
- [Plant Engineering: How to ensure arc-flash labels match the way a plant runs](https://www.plantengineering.com/how-to-ensure-arc-flash-labels-match-the-way-a-plant-runs/)
- [OSHA: Control of Hazardous Energy (Lockout/Tagout) topic page](https://www.osha.gov/control-hazardous-energy)

## More jobs for the Maintenance Manager

[Break the reactive cycle](https://rivet.mapped.com/personas/job/manufacturing/maintenance-manager/break-the-reactive-cycle) · [Turn pdm alerts into planned work](https://rivet.mapped.com/personas/job/manufacturing/maintenance-manager/turn-pdm-alerts-into-planned-work) · [Keep critical spares and bom right](https://rivet.mapped.com/personas/job/manufacturing/maintenance-manager/keep-critical-spares-and-bom-right) · [Fix CMMS data so it can be trusted](https://rivet.mapped.com/personas/job/manufacturing/maintenance-manager/fix-cmms-data-so-it-can-be-trusted)

## Every kind of facility

[Airports](https://rivet.mapped.com/personas/facility/airport) · [Cross-cutting and portfolio roles](https://rivet.mapped.com/personas/facility/cross-cutting) · [Data center](https://rivet.mapped.com/personas/facility/data-center) · [Education campuses](https://rivet.mapped.com/personas/facility/education) · [Government, civic and public-safety buildings](https://rivet.mapped.com/personas/facility/government-civic) · [Hospitals and healthcare facilities](https://rivet.mapped.com/personas/facility/healthcare) · [Laboratories and life-science facilities](https://rivet.mapped.com/personas/facility/laboratory) · [Manufacturing plants and industrial sites](https://rivet.mapped.com/personas/facility/manufacturing) · [Multifamily residential and rental housing](https://rivet.mapped.com/personas/facility/multifamily-residential) · [Office buildings and corporate workplaces](https://rivet.mapped.com/personas/facility/office) · [Retail, hospitality and venues](https://rivet.mapped.com/personas/facility/retail-hospitality) · [Transit, terminals and parking](https://rivet.mapped.com/personas/facility/transit-parking) · [Utilities and critical process infrastructure](https://rivet.mapped.com/personas/facility/utilities-infrastructure) · [Warehouses and distribution centers](https://rivet.mapped.com/personas/facility/warehouse)

## Every job category

[Uptime](https://rivet.mapped.com/personas/category/uptime) · [Maintenance](https://rivet.mapped.com/personas/category/maintenance) · [Energy](https://rivet.mapped.com/personas/category/energy) · [Sustainability](https://rivet.mapped.com/personas/category/sustainability) · [Safety](https://rivet.mapped.com/personas/category/safety) · [Compliance](https://rivet.mapped.com/personas/category/compliance) · [Security](https://rivet.mapped.com/personas/category/security) · [Space](https://rivet.mapped.com/personas/category/space) · [Occupancy](https://rivet.mapped.com/personas/category/occupancy) · [Experience](https://rivet.mapped.com/personas/category/experience) · [Cost](https://rivet.mapped.com/personas/category/cost) · [Capital planning](https://rivet.mapped.com/personas/category/capital_planning) · [Workforce](https://rivet.mapped.com/personas/category/workforce) · [Vendor](https://rivet.mapped.com/personas/category/vendor) · [Throughput](https://rivet.mapped.com/personas/category/throughput) · [Quality](https://rivet.mapped.com/personas/category/quality) · [Customer](https://rivet.mapped.com/personas/category/customer) · [IT and OT](https://rivet.mapped.com/personas/category/it_ot) · [Cleaning](https://rivet.mapped.com/personas/category/cleaning) · [Resilience](https://rivet.mapped.com/personas/category/resilience)

---

From [PersonaDB](https://rivet.mapped.com/personas), Mapped’s directory of who works in a facility and what they’re trying to get done, free to reuse under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/) with credit to Mapped. Page: https://rivet.mapped.com/personas/job/manufacturing/maintenance-manager/stay-compliant-on-loto-and-electrical-safety
