---
title: "Set maintenance strategy by criticality"
description: "When building or revising PMs, I want asset criticality, failure modes and consequence captured so I can choose condition-based, time-based or…"
author: Mapped
license: https://creativecommons.org/licenses/by/4.0/
canonical: https://rivet.mapped.com/personas/job/manufacturing/reliability-engineer/set-maintenance-strategy-by-criticality
---

# Set maintenance strategy by criticality

Job to be done · Reliability Engineer

In [Maintenance](https://rivet.mapped.com/personas/category/maintenance) · for the [Reliability Engineer](https://rivet.mapped.com/personas/role/manufacturing/reliability-engineer) in [Manufacturing plants and industrial sites](https://rivet.mapped.com/personas/facility/manufacturing)

> When building or revising PMs, I want asset criticality, failure modes and consequence captured so I can choose condition-based, time-based or run-to-failure tasks deliberately instead of inheriting OEM intervals.

## Apps that fit

Report · Workflow

## Measured by

- % critical assets with documented strategy
- PM hours on low-criticality assets

## What an app needs to see

- asset register with criticality
- FMEA/FMECA records
- PM task list and intervals
- failure history

## Pain points

- RCM finds most failures are not linked to asset age, which challenges fixed-life replacement (Wikipedia RCM)
- Run-to-failure is a legitimate option for non-critical functions (Wikipedia RCM)

## Who else wants this

### Airports

- Director of Facilities / Maintenance: [Plan asset renewal with condition data](https://rivet.mapped.com/personas/job/airport/airport-facilities-maintenance-director/plan-asset-renewal-with-condition-data)
- Director of Facilities / Maintenance: [Onboard new equipment into the CMMS at commissioning](https://rivet.mapped.com/personas/job/airport/airport-facilities-maintenance-director/onboard-new-equipment-into-the-cmms-at-commissioning)

### Cross-cutting and portfolio roles

- Portfolio / Regional Facilities Director: [Plan regional capital from condition](https://rivet.mapped.com/personas/job/cross-cutting/portfolio-regional-facilities-director/plan-regional-capital-from-condition)
- Digital Twin / BIM Manager (owner-side): [Use the twin for capital renewals](https://rivet.mapped.com/personas/job/cross-cutting/digital-twin-bim-manager/use-the-twin-for-capital-renewals)
- Asset Management / Lifecycle & Capital Planning Manager: [Link condition to live failures](https://rivet.mapped.com/personas/job/cross-cutting/asset-lifecycle-capital-planning-manager/link-condition-to-live-failures)
- Maintenance Planner / Scheduler: [Trigger PMs from run hours not the calendar](https://rivet.mapped.com/personas/job/cross-cutting/maintenance-planner-scheduler/trigger-pms-from-run-hours-not-the-calendar)

### Office buildings and corporate workplaces

- Director of Facilities: [See PM compliance and backlog across buildings](https://rivet.mapped.com/personas/job/office/director-of-facilities/see-pm-compliance-and-backlog-across-buildings)

### Utilities and critical process infrastructure

- Maintenance Manager / Maintenance Superintendent: [Replace run to failure with a plan](https://rivet.mapped.com/personas/job/utilities-infrastructure/maintenance-manager/replace-run-to-failure-with-a-plan)

## Sources

- [Accendo Reliability: 10 things a reliability engineer can do today (Doug Plucknette)](https://accendoreliability.com/10-things-reliability-engineer-can-today-improve-reliability/)
- [Wikipedia: Reliability-centered maintenance](https://en.wikipedia.org/wiki/Reliability-centered_maintenance)
- [TSMC Arizona: Facilities Water Engineer (posted Oct 8, 2026)](https://ro.careers.tsmc.com/job/Phoenix-Facilities-Water-Engineer-AZ-85083/1214440566/)

## More jobs for the Reliability Engineer

[Find bad actors from cmms and pdm](https://rivet.mapped.com/personas/job/manufacturing/reliability-engineer/find-bad-actors-from-cmms-and-pdm) · [Make condition alerts actionable](https://rivet.mapped.com/personas/job/manufacturing/reliability-engineer/make-condition-alerts-actionable) · [Stop repeat lubrication failures](https://rivet.mapped.com/personas/job/manufacturing/reliability-engineer/stop-repeat-lubrication-failures) · [Run RCA and verify the fix worked](https://rivet.mapped.com/personas/job/manufacturing/reliability-engineer/run-rca-and-verify-the-fix-worked)

## Every kind of facility

[Airports](https://rivet.mapped.com/personas/facility/airport) · [Cross-cutting and portfolio roles](https://rivet.mapped.com/personas/facility/cross-cutting) · [Data center](https://rivet.mapped.com/personas/facility/data-center) · [Education campuses](https://rivet.mapped.com/personas/facility/education) · [Government, civic and public-safety buildings](https://rivet.mapped.com/personas/facility/government-civic) · [Hospitals and healthcare facilities](https://rivet.mapped.com/personas/facility/healthcare) · [Laboratories and life-science facilities](https://rivet.mapped.com/personas/facility/laboratory) · [Manufacturing plants and industrial sites](https://rivet.mapped.com/personas/facility/manufacturing) · [Multifamily residential and rental housing](https://rivet.mapped.com/personas/facility/multifamily-residential) · [Office buildings and corporate workplaces](https://rivet.mapped.com/personas/facility/office) · [Retail, hospitality and venues](https://rivet.mapped.com/personas/facility/retail-hospitality) · [Transit, terminals and parking](https://rivet.mapped.com/personas/facility/transit-parking) · [Utilities and critical process infrastructure](https://rivet.mapped.com/personas/facility/utilities-infrastructure) · [Warehouses and distribution centers](https://rivet.mapped.com/personas/facility/warehouse)

## Every job category

[Uptime](https://rivet.mapped.com/personas/category/uptime) · [Maintenance](https://rivet.mapped.com/personas/category/maintenance) · [Energy](https://rivet.mapped.com/personas/category/energy) · [Sustainability](https://rivet.mapped.com/personas/category/sustainability) · [Safety](https://rivet.mapped.com/personas/category/safety) · [Compliance](https://rivet.mapped.com/personas/category/compliance) · [Security](https://rivet.mapped.com/personas/category/security) · [Space](https://rivet.mapped.com/personas/category/space) · [Occupancy](https://rivet.mapped.com/personas/category/occupancy) · [Experience](https://rivet.mapped.com/personas/category/experience) · [Cost](https://rivet.mapped.com/personas/category/cost) · [Capital planning](https://rivet.mapped.com/personas/category/capital_planning) · [Workforce](https://rivet.mapped.com/personas/category/workforce) · [Vendor](https://rivet.mapped.com/personas/category/vendor) · [Throughput](https://rivet.mapped.com/personas/category/throughput) · [Quality](https://rivet.mapped.com/personas/category/quality) · [Customer](https://rivet.mapped.com/personas/category/customer) · [IT and OT](https://rivet.mapped.com/personas/category/it_ot) · [Cleaning](https://rivet.mapped.com/personas/category/cleaning) · [Resilience](https://rivet.mapped.com/personas/category/resilience)

---

From [PersonaDB](https://rivet.mapped.com/personas), Mapped’s directory of who works in a facility and what they’re trying to get done, free to reuse under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/) with credit to Mapped. Page: https://rivet.mapped.com/personas/job/manufacturing/reliability-engineer/set-maintenance-strategy-by-criticality
