title: "Find the dead signal before operations does"
description: "When a transmitter flatlines or a remote station stops reporting, I want stale-data and communication-loss alarms that name the device and site, so I can…"
author: Mapped
license: https://creativecommons.org/licenses/by/4.0/
canonical: https://rivet.mapped.com/personas/job/utilities-infrastructure/instrumentation-controls-technician/find-the-dead-signal-before-operations-does
---

# Find the dead signal before operations does

Job to be done · Instrumentation & Controls Technician (SCADA / I&C)

In [IT and OT](https://rivet.mapped.com/personas/category/it_ot) · for the [Instrumentation & Controls Technician (SCADA / I&C)](https://rivet.mapped.com/personas/role/utilities-infrastructure/instrumentation-controls-technician) in [Utilities and critical process infrastructure](https://rivet.mapped.com/personas/facility/utilities-infrastructure)

> When a transmitter flatlines or a remote station stops reporting, I want stale-data and communication-loss alarms that name the device and site, so I can fix the link before operators act on frozen values.

## Apps that fit

Alerts · Board

## Measured by

- stale-data events
- comm loss duration by site
- time to detect

## What an app needs to see

- per-device last-update timestamps
- radio / network link status
- stale-data (stagnant value) detection
- alarm acknowledgement log
- UPS inventory per PLC/control panel with battery install date vs rated life, last load test and health-monitor status
- remote-site communications health: last poll per RTU/PLC, unexpected IP or password change events, and cellular modem inventory with access path (VPN/secure gateway or direct)

## Pain points

- A SCADA failure froze data for more than thirty minutes without alarms because values stayed within tolerance; the fix was a heartbeat monitor on stagnant data (NERC)
- A pop-up loss-of-communication message was missed because it was not audible, costing three hours of control (NERC)

## Who else wants this

### Airports

- Airport Noise Abatement Officer / Specialist: [Keep the monitoring terminals calibrated and reporting](https://rivet.mapped.com/personas/job/airport/airport-noise-abatement-officer/keep-the-monitoring-terminals-calibrated-and-reporting)
- Environmental / Sustainability Manager: [Build the ghg inventory from live data](https://rivet.mapped.com/personas/job/airport/environmental-sustainability-manager/build-the-ghg-inventory-from-live-data)

### Cross-cutting and portfolio roles

- Building Automation / Controls Engineer and Systems Integrator: [Rationalise alarms so they get acted on](https://rivet.mapped.com/personas/job/cross-cutting/building-automation-controls-engineer/rationalise-alarms-so-they-get-acted-on)

### Data center

- Controls / Operations Systems Specialist (BMS, EPMS, DCIM): [Know when the monitoring itself is broken](https://rivet.mapped.com/personas/job/data-center/controls-and-operations-systems-specialist/know-when-the-monitoring-itself-is-broken)

### Manufacturing plants and industrial sites

- Facilities Engineer / Facilities Manager (plant buildings and utilities): [Catch utility failures before the line does](https://rivet.mapped.com/personas/job/manufacturing/plant-facilities-engineer-manager/catch-utility-failures-before-the-line-does)

### Retail, hospitality and venues

- Energy Manager (multi-site retail / hospitality): [Report emissions and energy for CSR](https://rivet.mapped.com/personas/job/retail-hospitality/multi-site-energy-manager/report-emissions-and-energy-for-csr)

### Transit, terminals and parking

- Supervisor, Fare Collection Equipment and Revenue Control: [Spot revenue loss in the collection chain](https://rivet.mapped.com/personas/job/transit-parking/fare-collection-equipment-supervisor/spot-revenue-loss-in-the-collection-chain)

### Utilities and critical process infrastructure

- Power System Dispatcher / System Operator: [Know when the screen is lying](https://rivet.mapped.com/personas/job/utilities-infrastructure/power-system-dispatcher/know-when-the-screen-is-lying)

## Sources

- [Guadalupe-Blanco River Authority: SCADA Technician posting](https://recruiting.paylocity.com/recruiting/jobs/Details/4530774/Guadalupe-Blanco-River-Authority/SCADA-TECHNICIAN)
- [NERC Lesson Learned 20130202: SCADA Failure Resulting in Loss of Monitoring Function (2013)](https://www.nerc.com/globalassets/programs/event-analysis/lessons-learned/ll20130203_scada_failure_resulting_in_loss_of_monitoring_function.pdf)
- [NERC Lesson Learned 20190801: Loss of Monitoring or Control Capability due to Power Supply Failure (2019)](https://www.nerc.com/globalassets/programs/event-analysis/lessons-learned/20190801_loss_of_monitoring_control_due_to_power_supply_failure.pdf)
- [SEH for VDH-ODW: Richmond Water Crisis Root Cause Analysis and Needs Assessment](https://www.vdh.virginia.gov/content/uploads/sites/6/2025/04/REDACTED_CRITICAL-INFRASTRUCTURE_SEH-Richmond-Water-Works-Root-Cause-Analysis-and-Needs-Assessment-2.pdf)
- [CISA Internet Exposure Reduction Guidance](https://www.cisa.gov/resources-tools/resources/exposure-reduction)

## More jobs for the Instrumentation & Controls Technician (SCADA / I&C)

[Calibrate what the permit depends on](https://rivet.mapped.com/personas/job/utilities-infrastructure/instrumentation-controls-technician/calibrate-what-the-permit-depends-on) · [Migrate the obsolete control system without losing the plant](https://rivet.mapped.com/personas/job/utilities-infrastructure/instrumentation-controls-technician/migrate-the-obsolete-control-system-without-losing-the-plant) · [Take the callout with spares on the truck](https://rivet.mapped.com/personas/job/utilities-infrastructure/instrumentation-controls-technician/take-the-callout-with-spares-on-the-truck)

## Every kind of facility

[Airports](https://rivet.mapped.com/personas/facility/airport) · [Cross-cutting and portfolio roles](https://rivet.mapped.com/personas/facility/cross-cutting) · [Data center](https://rivet.mapped.com/personas/facility/data-center) · [Education campuses](https://rivet.mapped.com/personas/facility/education) · [Government, civic and public-safety buildings](https://rivet.mapped.com/personas/facility/government-civic) · [Hospitals and healthcare facilities](https://rivet.mapped.com/personas/facility/healthcare) · [Laboratories and life-science facilities](https://rivet.mapped.com/personas/facility/laboratory) · [Manufacturing plants and industrial sites](https://rivet.mapped.com/personas/facility/manufacturing) · [Multifamily residential and rental housing](https://rivet.mapped.com/personas/facility/multifamily-residential) · [Office buildings and corporate workplaces](https://rivet.mapped.com/personas/facility/office) · [Retail, hospitality and venues](https://rivet.mapped.com/personas/facility/retail-hospitality) · [Transit, terminals and parking](https://rivet.mapped.com/personas/facility/transit-parking) · [Utilities and critical process infrastructure](https://rivet.mapped.com/personas/facility/utilities-infrastructure) · [Warehouses and distribution centers](https://rivet.mapped.com/personas/facility/warehouse)

## Every job category

[Uptime](https://rivet.mapped.com/personas/category/uptime) · [Maintenance](https://rivet.mapped.com/personas/category/maintenance) · [Energy](https://rivet.mapped.com/personas/category/energy) · [Sustainability](https://rivet.mapped.com/personas/category/sustainability) · [Safety](https://rivet.mapped.com/personas/category/safety) · [Compliance](https://rivet.mapped.com/personas/category/compliance) · [Security](https://rivet.mapped.com/personas/category/security) · [Space](https://rivet.mapped.com/personas/category/space) · [Occupancy](https://rivet.mapped.com/personas/category/occupancy) · [Experience](https://rivet.mapped.com/personas/category/experience) · [Cost](https://rivet.mapped.com/personas/category/cost) · [Capital planning](https://rivet.mapped.com/personas/category/capital_planning) · [Workforce](https://rivet.mapped.com/personas/category/workforce) · [Vendor](https://rivet.mapped.com/personas/category/vendor) · [Throughput](https://rivet.mapped.com/personas/category/throughput) · [Quality](https://rivet.mapped.com/personas/category/quality) · [Customer](https://rivet.mapped.com/personas/category/customer) · [IT and OT](https://rivet.mapped.com/personas/category/it_ot) · [Cleaning](https://rivet.mapped.com/personas/category/cleaning) · [Resilience](https://rivet.mapped.com/personas/category/resilience)

---

From [PersonaDB](https://rivet.mapped.com/personas), Mapped’s directory of who works in a facility and what they’re trying to get done, free to reuse under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/) with credit to Mapped. Page: https://rivet.mapped.com/personas/job/utilities-infrastructure/instrumentation-controls-technician/find-the-dead-signal-before-operations-does