Job to be done · Central Plant / Utilities Manager

Be ready for utility power loss

See it in the graph

When the utility feed is at risk, I want to know which buildings and critical rooms can be carried by cogen and what a transition requires, so I can coordinate an uninterrupted switch rather than a cold restart.

Apps that fit

  • Board
  • Checklist
  • 3D view

Measured by

  • time to transition to island mode
  • critical loads covered
  • black-start readiness

What an app needs to see

  • cogen status and output
  • feeder/breaker status
  • critical room list with electrical path
  • generator test records

Pain points

  • Berkeley: 'the campus can provide power independently of PG&E, but it needs to be coordinated ... the cogen plant is not black start capable'
  • Faculty: walk-in fridges and freezers 'continually failing' leads to loss of critical reagents

Who else wants this

Airports

Data center

Education campuses

Hospitals and healthcare facilities

Sources

More jobs for the Central Plant / Utilities Manager

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this job with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Be ready for utility power loss”, PersonaDB, Mapped, https://rivet.mapped.com/personas/job/education/central-plant-utilities-manager/be-ready-for-utility-power-loss