Job to be done · Facilities Manager (laboratory / GMP site)
Cut lab energy without compromising safety
When my lab building uses 5-10 times the energy of an office, I want to benchmark it and see hood sash, unoccupied setback and ULT freezer performance, so I can target measures that save energy safely.
Apps that fit
- Scorecard
- Board
- Report
Measured by
- EUI and Labs2Zero Energy Score percentile
- average sash position
- unoccupied ACH achieved
- kWh per ULT freezer
What an app needs to see
- building and lab-floor energy meters
- sash position from BAS (e.g., 15-minute samples)
- occupancy sensors and setback mode status
- freezer power or temperature setpoints
- exhaust CFM
- ventilation level assigned per lab room from its updated hazard classification, with real-time ventilation management to right-size airflow
Pain points
- Engineers default to the upper end of the Z9.5 150-375 ACH hood minimum range, which is the key barrier to savings
- A single open fume hood can use as much energy as 3.5 homes
- 'These savings directly impact FMD's budget'
Who else wants this
Airports
- Director of Facilities / Maintenance: Plan asset renewal with condition data
- Baggage Handling System (BHS) Manager: Hold the om contractor to the PM program
- Environmental / Sustainability Manager: Build the ghg inventory from live data
- Terminal / Landside Operations Manager: Report terminal and landside performance monthly
Cross-cutting and portfolio roles
- Energy & Sustainability Director: Close the books on emissions every month
Education campuses
- Associate Vice Chancellor / AVP for Facilities: See service performance across in house and contract teams
Laboratories and life-science facilities
- Green Labs / Laboratory Sustainability Program Manager: Run shut the sash from BAS data
- Green Labs / Laboratory Sustainability Program Manager: Cut ULT freezer energy without risking samples
Sources
- Consulting-Specifying Engineer: Determining proper laboratory ventilation
- HVAC&R News: Global scheme helping laboratories reach net zero (I2SL Labs2Zero)
- Payette: Shut the Sash, Part 3
- UChicago Office of Sustainability: Shut the Sash
- UGA Research: Green Labs making science more sustainable
- I2SL 2026 Annual Conference, Session A: Decarbonization Policy for a Global Biotech Hub: Cambridge's BEUDO (abstract)
More jobs for the Facilities Manager (laboratory / GMP site)
Every kind of facility
- Airports
- Cross-cutting and portfolio roles
- Data center
- Education campuses
- Government, civic and public-safety buildings
- Hospitals and healthcare facilities
- Laboratories and life-science facilities
- Manufacturing plants and industrial sites
- Multifamily residential and rental housing
- Office buildings and corporate workplaces
- Retail, hospitality and venues
- Transit, terminals and parking
- Utilities and critical process infrastructure
- Warehouses and distribution centers