Job to be done · Continuous Improvement / Lean / OpEx Manager

Prove a kaizen stuck

See it in the graph

When a kaizen event closes, I want the metric it targeted tracked for 90 days, so I can show the problem stayed solved or reopen it, instead of counting events as results.

Apps that fit

  • Report
  • Scorecard

Measured by

  • sustained improvement at 30/60/90 days
  • events with verified savings

What an app needs to see

  • before/after metric from MES/CMMS/quality
  • event records and owners

Pain points

  • 'A Successful Kaizen Event Means the Problem Is Solved' is listed as a lean myth (IndustryWeek)
  • 'True success is defined by long-term sustainability rather than initial implementation' (IndustryWeek)

Who else wants this

Airports

Cross-cutting and portfolio roles

Data center

Education campuses

Warehouses and distribution centers

Sources

More jobs for the Continuous Improvement / Lean / OpEx Manager

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this job with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Prove a kaizen stuck”, PersonaDB, Mapped, https://rivet.mapped.com/personas/job/manufacturing/continuous-improvement-lean-manager/prove-a-kaizen-stuck