Job to be done · Director of Manufacturing Operations / VP Operations

Judge reactive vs planned maintenance trend

See it in the graph

When maintenance asks for headcount or a reliability program budget, I want the reactive-vs-planned trend, backlog weeks and cost of unreliability by asset, so I can fund the program that stops the next emergency rather than the loudest request.

Apps that fit

  • Scorecard
  • Report

Measured by

  • reactive maintenance % of hours
  • planned maintenance percentage
  • maintenance cost % RAV (SMRP best in class 'generally less than 3%' per forum)
  • cost of unreliability per bad actor

What an app needs to see

  • work orders by type (PM/PdM/CM/emergency) and hours
  • downtime cost per asset
  • backlog hours by status
  • RAV per asset

Pain points

  • 'Those holding the reins and the checkbook must recognize how crucial planning and scheduling is' (Plant Engineering)
  • 'the urgent job keeps taking the time needed to prevent the next one' (Reliable Plant)
  • Leaders question the value of monitoring spend when a monitored crane gearbox still fails (KCF)

Who else wants this

Cross-cutting and portfolio roles

Education campuses

Hospitals and healthcare facilities

Manufacturing plants and industrial sites

Office buildings and corporate workplaces

Utilities and critical process infrastructure

Sources

More jobs for the Director of Manufacturing Operations / VP Operations

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this job with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Judge reactive vs planned maintenance trend”, PersonaDB, Mapped, https://rivet.mapped.com/personas/job/manufacturing/director-of-manufacturing-operations/judge-reactive-vs-planned-maintenance-trend