Job to be done · Maintenance Manager

Turn pdm alerts into planned work

See it in the graph

When a vibration, thermal or current alert fires, I want it to become a planned work order with parts and a window rather than a 'keep an eye on it' note, so I can prove PdM prevents failures instead of watching a monitored asset fail anyway.

Apps that fit

  • Workflow
  • Alerts
  • Board

Measured by

  • alerts converted to work orders
  • time from alert to work order
  • failures on monitored assets

What an app needs to see

  • vibration/temperature/current sensor alarms
  • asset criticality
  • spares availability
  • CMMS work order creation

Pain points

  • Overhead crane gearbox 'catastrophically fails' while leaders question the vibration spend; superintendent 'gives direction to keep an eye on it' (KCF)
  • A run of good monthly reports followed by a failure 'will leave everyone wondering why PdM doesn't work' (KCF)
  • Condition alerts often need to become work orders automatically (search summary, Fabrico)

Who else wants this

Airports

Cross-cutting and portfolio roles

Manufacturing plants and industrial sites

Multifamily residential and rental housing

Utilities and critical process infrastructure

Sources

More jobs for the Maintenance Manager

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this job with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Turn pdm alerts into planned work”, PersonaDB, Mapped, https://rivet.mapped.com/personas/job/manufacturing/maintenance-manager/turn-pdm-alerts-into-planned-work