Education campuses

Capital Planning / Construction Project Manager

Also posted as Capital Projects Manager, Project Manager, Planning Design & Construction, Director of Capital Planning, University Architect (lead), Construction Manager, Facilities Planner, Owner's Representative

See it in the graph

Plans and delivers renovations, renewals and new construction from the capital program (TAMU's University Architect manages ~200 projects; Ohio University 137 projects/~$366M), turning deferred-maintenance and master-plan priorities into funded, scheduled projects, coordinating with operations on shutdowns and turnover to standards.

What they do

  • Develop the multi-year capital improvement program from the master plan, condition assessments and DM priorities
  • Manage design, bidding, construction, budget, schedule and code compliance; act as owner's representative
  • Coordinate shutdowns, phasing and occupant impacts with operations and facility coordinators
  • Ensure turnover to campus standards (BAS, metering, space inventory, O&M documentation, training)
  • Report progress and cost tracking to leadership and boards

What they measure

  • projects on time / on budget
  • DM reduced per $ invested
  • change order rate
  • turnover deficiencies
  • occupant disruption complaints
  • Deferred maintenance projects funded vs listed
  • Facility Condition Index (FCI)

Systems they use

  • PMWeb / capital project management
  • Primavera / MS Project
  • Revit / AutoCAD / BIM
  • condition assessment database
  • ERP
  • Facility Infrastructure Renewal Model (FIRM, UCOP)

Certifications

  • PE / RA
  • PMP
  • CCM
  • LEED AP

Standards they work to

  • Uniformat (asset classification for condition assessments): Used to decompose buildings for facility condition assessments; the most used format among the study panel.
  • MasterFormat (asset classification for condition assessments): Used to decompose buildings for facility condition assessments; second most used among the study panel.
  • OmniClass Table 23 (component-level classification): A component-level format for decomposing buildings in condition assessments; little used by the study panel.

Jobs to be done

Pain points

  • A 2025 facility assessment of Henrico schools found about $92M immediate deferred maintenance across 58 facilities and that boilers and air handlers lack a systematic replacement strategy and often run to failure; temporary chillers can stay up to a year while design, bid and procurement run. (heard in 12 On Your Side: Henrico Schools' new operations chief details HVAC repair plans (2026-09-10))
  • California does not collect statewide data on school AC systems; upgrades depend on local bonds tied to property values, and the CalSHAPE assessment program ($421M to 3,800+ schools, 2021-2023) closed to new applications in July 2024. (heard in CalMatters: California kids sweltering in schools with no air conditioning (2024-10-01))
  • A UC campus audit found the deferred maintenance list rests on Physical Plant inspections, but budget cuts had scaled back planned and preventive inspection frequencies, degrading the information behind the project list and raising the risk of breakdowns, expedited-freight parts and downtime. (heard in UC Santa Cruz Internal Audit Report SC-14-02, Deferred Maintenance Review (August 2013))
  • UNC Charlotte researchers reporting an APPA CFaR Delphi study (four higher-ed FM practitioners, nine FM consultants) write that condition assessments remain highly subjective, depend on assessors' experience and training, and are often done over long periods by various entities, making reports hard to compare; no FM hierarchy standard exists and owners' RFPs differ. (heard in Facility Condition Assessments: The How, When, and Why (APPA Facilities Manager, Jan/Feb 2018; CFaR Delphi study))

Sources

More roles in education campuses

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this role with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Capital Planning / Construction Project Manager”, PersonaDB, Mapped, https://rivet.mapped.com/personas/role/education/capital-planning-construction-manager