Runs the municipal energy and utility tracking program for city facilities: benchmarking in ENERGY STAR Portfolio Manager or comparable software, verifying utility bills, setting lead-by-example reduction targets, developing efficiency and performance-contract projects and pursuing grants, incentives and rebates. Coordinates energy upgrades with the facilities division and capital projects.

What they do

  • Administer energy benchmarking and utility tracking for municipal buildings; verify utility bills and meter data
  • Set and report progress against an energy use intensity (EUI) reduction goal with department sub-goals
  • Schedule and support energy audits and retro-commissioning; develop projects for city buildings
  • Facilitate utility rebates, financing and energy savings performance contracts; verify savings
  • Advise facilities and capital staff on efficient equipment, controls and design
  • Report to council and the public on energy, cost and emissions

What they measure

  • EUI by building vs baseline
  • annual % reduction vs target
  • utility cost avoided
  • rebates captured
  • buildings benchmarked %
  • ESPC guaranteed savings achieved
  • Share of portfolio floor area with tracked energy use

Systems they use

  • ENERGY STAR Portfolio Manager
  • utility bill management / interval data
  • BAS trend data
  • sub-meters
  • CIP and ESPC tracking
  • Power BI / Tableau
  • SDG&E Enterprise Energy Advisor (C3)
  • Energy Electronic Data Interchange (EDI) bill feed

Certifications

  • CEM (AEE)
  • LEED AP
  • Building Operator Certification

Jobs to be done

  • Find the worst buildings first · EnergyWhen I have a few hundred buildings and a small team, I want EUI and cost per square foot by building type with the outliers flagged, so I can target audits and retro-commissioning where the savings are. BoardScorecardReport
  • Verify the savings we were promised · EnergyWhen a performance contract or rebate project is complete, I want measured consumption before and after, normalised for weather and schedule, so I can confirm guaranteed savings and report real results. ReportBoard
  • Catch the building that runs all night · EnergyWhen a library or rec center's HVAC runs through closed hours or a setpoint has been overridden, I want BAS schedules and after-hours consumption surfaced, so I can fix it with the BAS tech before a month of waste shows on the bill. AlertsBoard
  • Report progress council can believe · SustainabilityWhen council set a 10-year reduction goal, I want one baseline year, consistent units and department sub-goals tracked with interim targets, so progress is credible and missed targets do not erode political will. ScorecardReport

Pain points

  • Fairfax's Energy Programs Manager runs the City's energy and utility tracking program across City facilities while also administering its Green Building Policy. (heard in City of Fairfax, VA job bulletin: Energy Programs Manager)
  • ACEEE's goal-setting guidance asks cities to weigh whether the capital budget can be used to prioritize efficiency investments when judging what reduction goal is attainable. (heard in ACEEE: Local Government Energy Management Goals, best practices and platforms (2015))
  • Local government buildings consume 2 quadrillion Btu a year and could save $3.7 billion annually through a 20% improvement (EIA, 2016). (heard in DOE Better Buildings: Local Government sector page)
  • San Diego's auditor found no program to verify the accuracy of utility invoices or to ensure the lowest eligible rate across about 3,500 gas and electric accounts and a $51M energy budget; an analyst spent about one hour a week checking 700-1,000 accounts before payment. (heard in City of San Diego Office of the City Auditor, Performance Audit of City Gas and Electric Utility Billing (OCA-17-018))
  • Monthly billing reports went to nine departments, but only one had a process to catch invoice errors; reports were still emailed to five inactive addresses and two reassigned employees, and the rate shown was not the actual rate billed. (heard in City of San Diego Office of the City Auditor, Performance Audit of City Gas and Electric Utility Billing (OCA-17-018))
  • Only one of nine departments reviewed the rates on its accounts; that department found alternative rates for 13 pump-station accounts worth an estimated $984,000 a year, plus demand charges billed on idle backup service lines. (heard in City of San Diego Office of the City Auditor, Performance Audit of City Gas and Electric Utility Billing (OCA-17-018))
  • Vermont's State Auditor compared 13 state building energy projects with the efficiency utility's records; recorded lifetime savings differed by more than 30% for 9 of them and were overstated by $1,666,511 in total, because savings were never finalized. (heard in Vermont State Auditor, Buildings and General Services Energy Audit (presentation to House Energy committee))
  • The state energy office could not reliably report progress on its energy plan: it had no documented baselines, no system to capture all state-owned building energy use (it controls only about 60% of state-owned space), and no system for energy used in leased space. (heard in Vermont State Auditor, Buildings and General Services Energy Audit (presentation to House Energy committee))
  • A courthouse lighting retrofit cost $72,749 more than its reported lifetime savings and was bundled with a parking-garage project into one revolving-fund loan so the pair would meet the payback limit. (heard in Vermont State Auditor, Buildings and General Services Energy Audit (presentation to House Energy committee))
  • NYC's Comptroller found the city's energy management division had no official procedure to prioritise buildings for efficiency projects, incomplete and unverified benchmarking data, and no in-house GHG reduction goals or tracking for city buildings. (heard in NYC Comptroller, Audit Report on DCAS Energy Conservation Efforts (7E14-120A))

Sources

More roles in government, civic and public-safety buildings

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this role with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Municipal Energy Manager”, PersonaDB, Mapped, https://rivet.mapped.com/personas/role/government-civic/municipal-energy-manager