Office buildings and corporate workplaces

Capital Projects / Construction Manager (office)

Also posted as Project Manager, Corporate Real Estate, Tenant Improvement Project Manager, Construction Manager (property), Capital Projects Manager, Design & Construction Manager, Workplace Projects Manager

See it in the graph

Delivers tenant improvements, floor refreshes, base-building replacements (chillers, roofs, elevators, BAS) and workplace renovations: scope, budget, schedule, bidding, contractor oversight, code compliance and the handover of new assets and drawings to operations.

What they do

  • Plan, schedule and coordinate construction and renovation to meet occupancy deadlines
  • Prepare budget estimates, progress reports and cost tracking; manage change orders
  • Run RFPs and competitive bidding; oversee contractors and consultants
  • Inspect work for compliance with building and safety codes
  • Coordinate with facilities, IT, security and space planning for move-in
  • Hand over as-builts, equipment data and warranties to operations and the IWMS/CMMS

What they measure

  • budget variance
  • schedule variance
  • change order %
  • punch list closure
  • safety incidents on site
  • handover completeness
  • Deferred maintenance backlog ($)

Systems they use

  • Procore
  • Primavera / MS Project
  • Bluebeam
  • AutoCAD / Revit
  • IWMS (project module)
  • ERP for POs
  • Primavera P6

Certifications

  • PMP
  • CCM
  • LEED AP
  • architecture/engineering degree

Jobs to be done

Pain points

  • The CEO of a construction-scheduling software firm writes that owners see capital-project progress through a monthly narrative and Gantt snapshot in a format designed for a scheduler, so delays surface late; he illustrates with a hypothetical lobby renovation reported on track that, four weeks later, slipped six weeks. (heard in Protecting the Pro Forma (Buildings.com, 2026-09-25; author is CEO of a scheduling software firm))
  • Phased renovation lets a building stay occupied, but each phase must maintain HVAC service, life-safety systems and egress in occupied areas, and the phasing plan aims to minimize costly swing space. (heard in Tenant and system criteria are keys to making phased renovations work (FacilitiesNet, search excerpt))
  • Missouri accumulated nearly $600 million of deferred maintenance on state facilities; its maintenance reserve fund received about $183 million less than appropriated over six years, mostly late in the fiscal year, and the required long-range capital plan was not prepared for 2002-2013. (heard in Office of Administration, Division of Facilities Management, Design and Construction, Missouri State Auditor Report 2016-065 (Aug 2016))

Sources

More roles in office buildings and corporate workplaces

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this role with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Capital Projects / Construction Manager (office)”, PersonaDB, Mapped, https://rivet.mapped.com/personas/role/office/capital-projects-manager