Job to be done · Maintenance Planner / Scheduler
Trigger PMs from run hours not the calendar
When equipment runs far more or less than assumed, I want PMs triggered from actual run hours and condition, so I can stop over- and under-maintaining.
Apps that fit
- Workflow
- Alerts
Measured by
- PMs adjusted
- failures between PMs
What an app needs to see
- equipment run status/hours from BMS
- PM intervals
- failure history
Pain points
- Planned maintenance can be triggered by date, running hours or condition but most PMs are calendar-based
Who else wants this
Airports
- Airfield Electrician / Airfield Lighting Technician: Keep the vault and generators ready
- Building / Terminal Maintenance Supervisor: Run snow and ice events with the same crew
Cross-cutting and portfolio roles
- Building Automation / Controls Engineer and Systems Integrator: See excess run time by floor
- Digital Twin / BIM Manager (owner-side): Use the twin for capital renewals
- Portfolio / Regional Facilities Director: Plan regional capital from condition
- Asset Management / Lifecycle & Capital Planning Manager: Quantify the cost of waiting
Hospitals and healthcare facilities
- Healthcare Technology Management (HTM) / Clinical Engineering Director or Manager: Justify AEM with failure data
Manufacturing plants and industrial sites
- Reliability Engineer: Set maintenance strategy by criticality
Sources
More jobs for the Maintenance Planner / Scheduler
Every kind of facility
- Airports
- Cross-cutting and portfolio roles
- Data center
- Education campuses
- Government, civic and public-safety buildings
- Hospitals and healthcare facilities
- Laboratories and life-science facilities
- Manufacturing plants and industrial sites
- Multifamily residential and rental housing
- Office buildings and corporate workplaces
- Retail, hospitality and venues
- Transit, terminals and parking
- Utilities and critical process infrastructure
- Warehouses and distribution centers