Job to be done · Reliability Engineer

Set maintenance strategy by criticality

See it in the graph

When building or revising PMs, I want asset criticality, failure modes and consequence captured so I can choose condition-based, time-based or run-to-failure tasks deliberately instead of inheriting OEM intervals.

Apps that fit

  • Report
  • Workflow

Measured by

  • % critical assets with documented strategy
  • PM hours on low-criticality assets

What an app needs to see

  • asset register with criticality
  • FMEA/FMECA records
  • PM task list and intervals
  • failure history

Pain points

  • RCM finds most failures are not linked to asset age, which challenges fixed-life replacement (Wikipedia RCM)
  • Run-to-failure is a legitimate option for non-critical functions (Wikipedia RCM)

Who else wants this

Airports

Cross-cutting and portfolio roles

Office buildings and corporate workplaces

Utilities and critical process infrastructure

Sources

More jobs for the Reliability Engineer

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this job with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Set maintenance strategy by criticality”, PersonaDB, Mapped, https://rivet.mapped.com/personas/job/manufacturing/reliability-engineer/set-maintenance-strategy-by-criticality