Job to be done · Instrumentation & Controls Technician (SCADA / I&C)
Find the dead signal before operations does
When a transmitter flatlines or a remote station stops reporting, I want stale-data and communication-loss alarms that name the device and site, so I can fix the link before operators act on frozen values.
Apps that fit
- Alerts
- Board
Measured by
- stale-data events
- comm loss duration by site
- time to detect
What an app needs to see
- per-device last-update timestamps
- radio / network link status
- stale-data (stagnant value) detection
- alarm acknowledgement log
- UPS inventory per PLC/control panel with battery install date vs rated life, last load test and health-monitor status
- remote-site communications health: last poll per RTU/PLC, unexpected IP or password change events, and cellular modem inventory with access path (VPN/secure gateway or direct)
Pain points
- A SCADA failure froze data for more than thirty minutes without alarms because values stayed within tolerance; the fix was a heartbeat monitor on stagnant data (NERC)
- A pop-up loss-of-communication message was missed because it was not audible, costing three hours of control (NERC)
Who else wants this
Airports
- Airport Noise Abatement Officer / Specialist: Keep the monitoring terminals calibrated and reporting
- Environmental / Sustainability Manager: Build the ghg inventory from live data
Cross-cutting and portfolio roles
- Building Automation / Controls Engineer and Systems Integrator: Rationalise alarms so they get acted on
Data center
- Controls / Operations Systems Specialist (BMS, EPMS, DCIM): Know when the monitoring itself is broken
Manufacturing plants and industrial sites
- Facilities Engineer / Facilities Manager (plant buildings and utilities): Catch utility failures before the line does
Retail, hospitality and venues
- Energy Manager (multi-site retail / hospitality): Report emissions and energy for CSR
Transit, terminals and parking
- Supervisor, Fare Collection Equipment and Revenue Control: Spot revenue loss in the collection chain
Utilities and critical process infrastructure
- Power System Dispatcher / System Operator: Know when the screen is lying
Sources
- Guadalupe-Blanco River Authority: SCADA Technician posting
- NERC Lesson Learned 20130202: SCADA Failure Resulting in Loss of Monitoring Function (2013)
- NERC Lesson Learned 20190801: Loss of Monitoring or Control Capability due to Power Supply Failure (2019)
- SEH for VDH-ODW: Richmond Water Crisis Root Cause Analysis and Needs Assessment
- CISA Internet Exposure Reduction Guidance
More jobs for the Instrumentation & Controls Technician (SCADA / I&C)
Every kind of facility
- Airports
- Cross-cutting and portfolio roles
- Data center
- Education campuses
- Government, civic and public-safety buildings
- Hospitals and healthcare facilities
- Laboratories and life-science facilities
- Manufacturing plants and industrial sites
- Multifamily residential and rental housing
- Office buildings and corporate workplaces
- Retail, hospitality and venues
- Transit, terminals and parking
- Utilities and critical process infrastructure
- Warehouses and distribution centers