Job to be done · Power System Dispatcher / System Operator
Know when the screen is lying
When SCADA data freezes but stays within tolerance, I want a stale-data heartbeat alarm and per-RTU last-update times, so I can tell a quiet Sunday from thirty minutes of blindness.
Apps that fit
- Alerts
- Board
Measured by
- stale-data events
- minutes without monitoring
- RTU communication availability
What an app needs to see
- per-point and per-RTU last-update timestamps
- ICCP link status
- state estimator mismatch
- control center UPS and generator status
- EMS function health strip: state-estimator/RTCA solution status and age, SCADA, ICCP and RTU link status, with an alarm when SCADA data is stale or the SE/RTCA solution is obsolete
- time-source health for SCADA/EMS servers and workstations: NTP source accepted/rejected, offset and jitter, and whether each redundant GPS clock is in service
Pain points
- A SCADA failure left a transmission owner without monitoring for more than thirty minutes; frozen ICCP data stayed within tolerance and the state estimator kept solving (NERC 2013)
- An entity lost multiple RTUs and used stale data for EMS analysis for 90 minutes after a tripped 480 V breaker drained the UPS (NERC 2019)
Who else wants this
Airports
- Terminal / Landside Operations Manager: Keep terminal equipment working for passengers
- Airport Noise Abatement Officer / Specialist: Keep the monitoring terminals calibrated and reporting
- Airport Noise Abatement Officer / Specialist: Link every complaint to the flight that caused it
- Airport Operations Agent / Airfield Operations Specialist: Keep NOTAMs accurate
- Operations Controller / Airport Dispatcher: Dispatch the right crew to an equipment failure
- Baggage Handling System (BHS) Manager: Hold the om contractor to the PM program
- Customer Experience / Guest Services Manager: Link ASQ scores to the operational causes
Utilities and critical process infrastructure
- Instrumentation & Controls Technician (SCADA / I&C): Find the dead signal before operations does
Sources
- NERC Lesson Learned 20130202: SCADA Failure Resulting in Loss of Monitoring Function (2013)
- NERC Lesson Learned 20190801: Loss of Monitoring or Control Capability due to Power Supply Failure (2019)
- NERC Energy Management System Performance Special Assessment (2018-2019)
- NERC Lesson Learned LL20250301: Loss of SCADA/EMS Monitoring and Control - GPS Clock Failure
More jobs for the Power System Dispatcher / System Operator
Every kind of facility
- Airports
- Cross-cutting and portfolio roles
- Data center
- Education campuses
- Government, civic and public-safety buildings
- Hospitals and healthcare facilities
- Laboratories and life-science facilities
- Manufacturing plants and industrial sites
- Multifamily residential and rental housing
- Office buildings and corporate workplaces
- Retail, hospitality and venues
- Transit, terminals and parking
- Utilities and critical process infrastructure
- Warehouses and distribution centers