Job to be done · SCADA / Controls Engineer and SCADA Manager
Cut the alarm flood to what matters
When operators are explaining nuisance alarms to management and ignoring the rest, I want alarm counts, chattering points and standing alarms by area, so I can rationalise limits and make the audible alarms mean something.
Apps that fit
- Board
- Report
Measured by
- alarms per operator per hour
- standing alarms over 24 h
- chattering points
- acknowledgement time
What an app needs to see
- alarm and event journal
- alarm configuration (thresholds/tolerances and audible vs. pop-up alarms)
- operator acknowledgement actions
- alarm ranking by frequency and time active, each alarm linked to its SCADA tag, PLC address and P&ID ID, to target nuisance alarms
Pain points
- Operators enter wrong values and set off alarms that must be explained to management, so limits are loosened (eng-tips)
- NERC's lesson from seven EMS outages: mandatory operator response to alarms should be reinforced and audible alarms are necessary for acknowledgement
- State estimator mismatch thresholds need periodic evaluation to balance sensitivity against false alarms (NERC)
Who else wants this
Cross-cutting and portfolio roles
- Building Automation / Controls Engineer and Systems Integrator: Rationalise alarms so they get acted on
Data center
- Controls / Operations Systems Specialist (BMS, EPMS, DCIM): Tune alarms so they mean something
Education campuses
- HVAC / Building Automation Controls Technician: Work the alarm list by priority not by noise
Laboratories and life-science facilities
- Facilities Automation / Monitoring Systems Engineer (BMS-EMS): Cut nuisance alarms so real ones get answered
- Lab Space Planner / Research Facilities Planner: Check lab fit against safety and ventilation constraints
Manufacturing plants and industrial sites
- Controls / Automation Engineer: Cut nuisance alarms operators ignore
- Industrial Hygienist: Trend exposure data for similar exposure groups
- Plant Security Manager (and Security Officers): Respond to door and alarm events by priority
Sources
- NERC Lesson Learned 20190801: Loss of Monitoring or Control Capability due to Power Supply Failure (2019)
- NERC Lesson Learned 20130202: SCADA Failure Resulting in Loss of Monitoring Function (2013)
- Eng-Tips thread: Water System Hack (Feb 2021)
- If you could improve one thing about your plant's alarm system (PLCtalk)
More jobs for the SCADA / Controls Engineer and SCADA Manager
Every kind of facility
- Airports
- Cross-cutting and portfolio roles
- Data center
- Education campuses
- Government, civic and public-safety buildings
- Hospitals and healthcare facilities
- Laboratories and life-science facilities
- Manufacturing plants and industrial sites
- Multifamily residential and rental housing
- Office buildings and corporate workplaces
- Retail, hospitality and venues
- Transit, terminals and parking
- Utilities and critical process infrastructure
- Warehouses and distribution centers