Utilities and critical process infrastructure

SCADA / Controls Engineer and SCADA Manager

Also posted as SCADA Engineer, Controls Engineer, Automation Engineer, SCADA Manager, SCADA Supervisor, Operational Technology Systems Specialist

See it in the graph

Designs, programs and keeps the control system that automates the plant and remote sites: PLC logic, HMI screens, alarm configuration, historian, radio and network, integrator contracts and the five-year SCADA capital budget. The role MES recommended Baltimore create would supervise electricians and technicians, assign work orders, maintain a SCADA capital plan and troubleshoot programs and network applications.

What they do

  • Program and maintain PLC logic, HMI screens, setpoint limits and alarm configuration; keep tested backups of logic and configurations
  • Administer the historian, control-room servers, radio and network; manage integrator and vendor contracts and migrations
  • Plan and manage a five-year SCADA capital budget; obtain quotes and submit requisitions
  • Support process control strategies with operations; monitor plant performance data and recommend optimizations
  • Maintain OT inventories, configuration diagrams and recovery documentation; evaluate vendor access and architecture changes for risk

What they measure

  • SCADA availability by site
  • alarm rate per operator-hour
  • logic backup currency
  • integration of plant processes (% automated)
  • migration milestones
  • capital budget execution

Systems they use

  • SCADA platforms (ABB, Ignition, VTScada, FactoryTalk, InTouch)
  • PLC/RTU programming tools
  • historian (OSIsoft PI)
  • network / radio management
  • virtualization and Windows servers
  • CMMS for SCADA work orders
  • Xylem Flygt MultiSmart
  • Inductive Automation Ignition

Certifications

  • BS in electrical, control or computer engineering typical
  • vendor platform certifications
  • ISA/IEC 62443 or GICSP increasingly requested

Jobs to be done

  • Cut the alarm flood to what matters · IT and OTWhen operators are explaining nuisance alarms to management and ignoring the rest, I want alarm counts, chattering points and standing alarms by area, so I can rationalise limits and make the audible alarms mean something. BoardReport
  • Keep logic backups and spares for every controller · ResilienceWhen an attacker can wipe a PLC's ladder logic or a controller dies, I want a verified recent backup and a spare recorded for every critical controller, so I can restore a site in hours rather than reverse-engineer it. ChecklistBoardAlerts
  • Bring the whole plant under control · Capital planningWhen centrifuges, polymer feed and sludge pumps sit in three buildings with no central control, I want each process's automation status and the integration work needed costed and sequenced, so I can fund and deliver the migration that stops manual running. BoardReportWorkflow
  • Give operators the data not just the screen · EnergyWhen the historian holds years of flow, dose and energy data nobody looks at, I want process KPIs trended by shift and benchmarked across plants, so I can show operations where kW/ton or chemical use drifted and why. BoardReport

Pain points

  • MES recommended a dedicated SCADA Manager at Back River to supervise technicians, keep a five-year SCADA capital budget and troubleshoot programs and networks, because many operations were not monitored or automated. (heard in Maryland Environmental Service: Back River WWTP Assessment Report (2022))
  • Water/wastewater engineers list SCADA, KYPipe, HEC-RAS, SQL and Python among technologies used (O*NET). (heard in O*NET 17-2051.02 Water/Wastewater Engineers)
  • Nearly 170,000 US water systems are increasingly automated, and federal agencies and others cite workforce skills gaps and older technologies that are difficult to update as challenges (GAO). (heard in GAO-24-106744 Critical Infrastructure Protection: EPA Urgently Needs a Strategy to Address Cybersecurity Risks to Water and Wastewater Systems)
  • Dedicated lift-station pump controllers are not fully programmable and get discontinued; a PLCtalk regular describes techs manually cycling pumps while trying to get a station back into Auto, then reaching for relays and DIN rail. (heard in Anyone recognize what PLC Flygt was using in their pumping control packages? (PLCtalk))
  • An integrator advises monitor-only RTUs rather than remote control at wastewater stations, saying customers have faced lawsuits or FBI-mandated upgrades after attacks even though EPA guidance is only a recommendation. (heard in Anyone recognize what PLC Flygt was using in their pumping control packages? (PLCtalk))
  • Richmond's switchgear SG-6 had no status or alarms to SCADA or the filter-plant control rooms; its Panalarm used to be wired to a control room but was abandoned during a previous project, leaving only a local alarm light grid. (heard in SEH for VDH-ODW: Richmond Water Crisis Root Cause Analysis and Needs Assessment)
  • A controls engineer says alarm lists are rarely specified up front, so most alarms share one priority, and nuisance alarms present at commissioning are never reviewed and stay for the plant's life (general industrial thread). (heard in If you could improve one thing about your plant's alarm system (PLCtalk))
  • A 2026 joint advisory reports actors exfiltrating project files from internet-exposed Rockwell, Schneider and Siemens PLCs in sectors including water and wastewater, modifying or deleting logic, manipulating HMI/SCADA display data, and changes that disabled critical shutdown and alarm logic. (heard in CISA/FBI/EPA Advisory AA26-097A: Iranian-Affiliated Cyber Actors Exploit PLCs)
  • CISA observed malicious activity in July 2026 against internet-exposed systems at more than 100 water and wastewater entities, commonly PLCs on a directly connected cellular modem; attackers changed IP addresses and passwords, causing loss of monitoring and control. (heard in CISA Internet Exposure Reduction Guidance)
  • EPA and CISA report that in 2024 hacktivists manipulated internet-exposed HMIs at water systems, maxing set points on pumps and blowers, turning off alarms and changing admin passwords so operators were locked out and had to run manually. (heard in EPA/CISA Fact Sheet: Internet-Exposed HMIs Pose Cybersecurity Risks to Water and Wastewater Systems)
  • A small city's upgrade quote put the PLC replacement at $20,585 and the HMI at $8,850 for one station, but adding a second (chief operator) client forced a server edition at $26,400; peers judged the programming labour underestimated and the RIO drive links unaddressed. (heard in PLC and SCADA Upgrade (PLCtalk))
  • An integrator working for a municipality was quoted about $5,500 to move three already-owned Wonderware licenses to Windows 7 without support (about $7,800 with a year of support), and was refused an engineer without a support contract. (heard in Water and Sewer plant. New PLC and scada system (PLCtalk))
  • A county water department with 50+ pump stations and treatment plants had old PLC-5s and newer PLCs but nobody held copies of the programs or Rockwell software, and no SOPs for the processes; an electrician from a municipal electric utility says the city's PLC-controlled wastewater plant likewise had no program or software, so logic problems meant calling the panel builder. (heard in City and County Water Treatment Facilities: are they required to have SOPs? (PLCtalk))

Sources

More roles in utilities and critical process infrastructure

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this role with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “SCADA / Controls Engineer and SCADA Manager”, PersonaDB, Mapped, https://rivet.mapped.com/personas/role/utilities-infrastructure/scada-controls-engineer