Cross-cutting and portfolio roles

Business Continuity / Emergency Management Lead

Also posted as Emergency Management Director, Emergency Preparedness Manager, Business Continuity Manager, Resilience Manager, Crisis Management Lead, Emergency Planner

See it in the graph

Plans for and coordinates response to disruptions: business impact analysis, recovery objectives (RTO/RPO/MTPD), the crisis command structure, exercises, and situation reporting during events. Facilities supplies the inventory of sites, systems and backup power the plans depend on; geopolitical and supply disruption now affects 71% of FM organisations.

What they do

  • Inventory sites, people, suppliers, technology and documents; run business impact analysis and risk assessment
  • Define recovery objectives and the crisis command structure; maintain plans to ISO 22301
  • Coordinate response: evacuations, shelter, communications; prepare situation status and damage reports
  • Run tabletop and complex exercises; maintain plans and resource lists
  • Liaise with municipalities, utilities and institutions

What they measure

  • RTO/RPO met in exercises
  • plan currency
  • exercise completion
  • time to situation report
  • generator/backup test compliance

Systems they use

  • WebEOC / OpsCenter
  • mass notification
  • ArcGIS
  • BC planning software (Sungard Assurance)
  • building systems status (generators, UPS, fire)

Certifications

  • CBCP (DRI)
  • CEM (IAEM)
  • ISO 22301 Lead Implementer

Standards they work to

  • International Fire Code (fire protection system impairments): When a required system is out of service: notify the fire department immediately, provide fire watch or evacuation, name an impairment coordinator (owner by default), tag FDC/valves/FACU, and follow a preplanned checklist including insurer and alarm company notification.
  • Emergency generator monthly load test (Joint Commission EC News, ASC): Monthly diesel generator tests must run at a dynamic load of at least 30% of nameplate or meet the manufacturer's exhaust gas temperature; battery lighting and transfer switch testing are also required.

Jobs to be done

  • Know site status in the first hour · ResilienceWhen an event hits, I want power, life-safety, access and occupancy status for every affected site on one map, so I can produce the situation report and direct response. MapBoardAlerts
  • Prove backup systems will work · ResilienceWhen planning for outages, I want generator, UPS and fuel test results and run data tracked per site, so I can trust the recovery assumptions. ScheduleChecklistReport
  • Keep the plan inventory current · ResilienceWhen sites, vendors and systems change, I want the continuity inventory synced from the IWMS and CMMS, so I can exercise against reality. WorkflowChecklist

Pain points

  • About 71% of FM organisations report at least moderate impact from global conflict and geopolitical disruption, most acutely on energy/utility reliability, fuel, generators and backup power. (heard in IFMA FM Market Pulse Report Q2 2026 (executive summary))
  • 71% of FM respondents in IFMA's Q2 2026 pulse reported at least a moderate impact from global conflict and geopolitical disruption; energy and utility cost or reliability is the most visible pressure point, and the most affected resources include fuel, generators and backup power. (heard in IFMA FM Market Pulse Report Q2 2026 (executive summary))
  • Joint Commission EC News (June 2022) reports that ambulatory surgery centers do generator inspections but miss components: batteries and transfer switches are the most commonly missed, usually because there is no inventory list; remote annunciators are often missing, individual transfer-switch test records are absent, and medical staff are often left overseeing generator maintenance. (heard in ASC Generator Gaps (Joint Commission Environment of Care News, June 2022))
  • An HFM article (2012) by a consultant and former Joint Commission standards interpreter, reviewing Joint Commission top-ten lists for the first half of 2011, lists emergency power (EC.02.05.07) among the most cited standards at critical access hospitals, noting generators run for not quite 30 minutes, carelessness about the 20-to-40-day monthly test interval, and that each automatic transfer switch must be tested and documented monthly; findings near the top of the lists occur in more than 50% of hospitals surveyed. (heard in Standard issues (HFM Magazine, 2012-01-01))
  • A DRJ article on consulting clients during 2020 found continuity programs losing momentum from fatigue after long overlapping events, and leadership assuming a successful COVID response meant no further planning was needed; idle buildings needed inspection before reopening. (heard in Cascading Crises: What Does Business Continuity Look Like Over the Next 12-18 Months? (Disaster Recovery Journal))
  • Many organizations manage vendor risk separately from business continuity, siloing information both teams need; a DRJ author urges asking for the results of a vendor's last DR exercise and whether alternatives exist where only one vendor supplies a critical product; smaller organizations assess vendors manually through spreadsheets or e-mailed surveys that need significant manual manipulation. (heard in Vendor Continuity Management: From Risk to Resilience (Disaster Recovery Journal, Summer 2019))

Sources

More roles in cross-cutting and portfolio roles

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this role with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Business Continuity / Emergency Management Lead”, PersonaDB, Mapped, https://rivet.mapped.com/personas/role/cross-cutting/business-continuity-emergency-management