Job to be done · Power System Dispatcher / System Operator

See the control centers own power

See it in the graph

When the control center's UPS has two hours of capacity and the documentation says eight, I want building power, ATS, generator and UPS runtime on my console with an audible alarm, so I can fail over to the backup center before the screens go black.

Apps that fit

  • Alerts
  • Board
  • Checklist

Measured by

  • UPS runtime remaining
  • generator monthly test completed at full load
  • failovers executed

What an app needs to see

  • UPS state and battery runtime
  • ATS position and utility feed status
  • generator test results
  • PDU loading per rack

Pain points

  • Maintenance staff told the dispatcher the UPS would last eight hours; the facility lost all power two hours later because the UPS had two hours and the generator's regulator had failed (NERC)
  • Building facilities treated a power supply alarm as false and did not notify the control center (NERC)

Who else wants this

Airports

Data center

Government, civic and public-safety buildings

Laboratories and life-science facilities

Utilities and critical process infrastructure

Sources

More jobs for the Power System Dispatcher / System Operator

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this job with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “See the control centers own power”, PersonaDB, Mapped, https://rivet.mapped.com/personas/job/utilities-infrastructure/power-system-dispatcher/see-the-control-centers-own-power