Runs the control center: regulates power flow between generation, substations, lines and customers; coordinates switching orders and clearances with engineers and field crews; responds to transformer and line failures by rerouting; directs control-room operators to start units; and maintains situational awareness through SCADA, EMS and outage management systems. Loss of monitoring is the failure mode NERC keeps writing lessons about.
What they do
- Coordinate with engineers, planners and field staff on clearances, switching orders and distribution changes
- Respond to emergencies such as transformer or line failures and reroute current; regulate flow between stations, lines and users while tracking circuit status
- Control, monitor or operate equipment regulating electricity using instrument or computer data; adjust distribution equipment
- Direct personnel operating distribution equipment; log events and outages; communicate with the reliability coordinator and balancing authority
- Acknowledge and act on alarms; escalate degraded monitoring to support staff
What they measure
- customer minutes of interruption (SAIDI/SAIFI)
- switching errors
- alarm acknowledgement time
- EMS availability
- restoration time
- Median EMS outage duration (minutes)
Systems they use
- SCADA / EMS (OSI monarch), WAMS
- outage management system (OMS)
- ICCP links to RC/BA
- GIS
- state estimator and alarm system
- switching order and clearance records
Certifications
- post-secondary certificate or associate degree common
- NERC system operator certification for grid-affecting positions (CareerOneStop per BLS)
- utility switching and clearance qualification
Jobs to be done
- Know when the screen is lying · IT and OTWhen SCADA data freezes but stays within tolerance, I want a stale-data heartbeat alarm and per-RTU last-update times, so I can tell a quiet Sunday from thirty minutes of blindness. AlertsBoard
- See the control centers own power · ResilienceWhen the control center's UPS has two hours of capacity and the documentation says eight, I want building power, ATS, generator and UPS runtime on my console with an audible alarm, so I can fail over to the backup center before the screens go black. AlertsBoardChecklist
- Restore the outage with the crew you have · UptimeWhen a storm takes lines down, I want outage locations, crew positions, switching orders and critical customers on one map, so I can sequence restoration and clearances safely with fewer experienced linemen. MapWorkflowBoard
Pain points
- Pop-up text alarms without sound were missed, costing three hours of control at a substation; NERC recommends audible alarms requiring operator acknowledgement. (heard in NERC Lesson Learned 20190801: Loss of Monitoring or Control Capability due to Power Supply Failure (2019))
- Power distributors and dispatchers earn a median $106,730 (May 2025), and their employment is projected to grow 1 percent from 2025 to 2035 (BLS). (heard in BLS OOH: Power Plant Operators, Distributors, and Dispatchers)
- Of EMS events reported to NERC in 2018-2019, loss of state estimator / real-time contingency analysis was the most common (52 percent, 84 events) and loss of SCADA second (29 percent, 47 events); median outage was 60 minutes. (heard in NERC Energy Management System Performance Special Assessment (2018-2019))
- Several 2019 EMS events at Canadian reliability coordinators lasted longer because improper alarm configurations delayed system operators becoming aware of the problem; median duration rose from 61 to 90 minutes. (heard in NERC Energy Management System Performance Special Assessment (2018-2019))
- One of two redundant GPS clocks on a SCADA/EMS network had failed and was not replaced; the spare installed days later missed the 2019 GPS week rollover (reporting 2004), and forcing servers onto it cost monitoring, control and ICCP links to neighbours. (heard in NERC Lesson Learned LL20250301: Loss of SCADA/EMS Monitoring and Control - GPS Clock Failure)
- During the GPS-clock EMS loss, operators asked neighbouring utilities to watch their transmission system, put substation electricians on standby to monitor key substations by hand, and relied on a SCADA Lite client for remote viewing. (heard in NERC Lesson Learned LL20250301: Loss of SCADA/EMS Monitoring and Control - GPS Clock Failure)
- An antivirus engine flaw deadlocked EMS servers, causing complete EMS loss for 31 minutes and, the next weekend, 81 minutes; failover never triggered because CPU, memory and disk counters stayed normal, and operators dispatched units manually using ACE from the RC every 10 minutes. (heard in NERC Lesson Learned LL20220901: Loss of EMS Functionality due to Server Resource Deadlock)
Sources
- O*NET 51-8012.00 Power Distributors and Dispatchers
- BLS OOH: Power Plant Operators, Distributors, and Dispatchers
- NERC Lesson Learned 20130202: SCADA Failure Resulting in Loss of Monitoring Function (2013)
- NERC Lesson Learned 20190801: Loss of Monitoring or Control Capability due to Power Supply Failure (2019)
- APPA Public Power: Small town revitalization, employee recruitment and retention
- NERC Energy Management System Performance Special Assessment (2018-2019)
- NERC Lesson Learned LL20250301: Loss of SCADA/EMS Monitoring and Control - GPS Clock Failure
- NERC Lesson Learned LL20220901: Loss of EMS Functionality due to Server Resource Deadlock
More roles in utilities and critical process infrastructure
- Utility General Manager / Director of Utilities
- Plant Superintendent / Plant Manager (water, wastewater, generation or central plant)
- Chief Plant Operator / Operations Shift Supervisor
- Water Treatment Plant Operator
- Wastewater Treatment Plant Operator
- Water Distribution Operator / Field Crew
- Wastewater Collection System Supervisor
- Sewer Collection System Technician / Crew
- Maintenance Manager / Maintenance Superintendent
- Plant Maintenance Mechanic (water / wastewater / powerhouse)
- Instrumentation & Controls Technician (SCADA / I&C)
- SCADA / Controls Engineer and SCADA Manager
- OT Systems & Cybersecurity Specialist
- Laboratory Supervisor / Water Quality Analyst
- Environmental Compliance & Pretreatment Manager
- Asset Management Program Manager (and GIS / asset data analysts)
- Capital Improvement Program Manager
- Utility Engineer (water / wastewater / electrical)
- Safety Officer / EHS Manager (utility)
- Energy Manager (utility / central plant)
- Power Plant Operator / Control Room Operator
- Substation Electrician / Relay Technician
- Electric Lineworker / Line Crew
- District Energy / Central Plant Operator (Stationary Engineer)
Every kind of facility
- Airports
- Cross-cutting and portfolio roles
- Data center
- Education campuses
- Government, civic and public-safety buildings
- Hospitals and healthcare facilities
- Laboratories and life-science facilities
- Manufacturing plants and industrial sites
- Multifamily residential and rental housing
- Office buildings and corporate workplaces
- Retail, hospitality and venues
- Transit, terminals and parking
- Utilities and critical process infrastructure
- Warehouses and distribution centers