Utilities and critical process infrastructure

Capital Improvement Program Manager

Also posted as CIP Manager, Senior Capital Improvement Program Manager, Capital Projects Manager, Engineering Program Manager, Project Engineering Manager, Construction Manager (utility)

See it in the graph

Represents a division (engineering, operations, maintenance or lab) in capital projects from master plan through preliminary and detailed design, bidding, construction, start-up, asset management initiation and turnover to the end user. Sets scope, budget and schedule, directs consultants and contractors, reports to the commission and gives operations' historical knowledge to the designers. Expected to walk into process tanks and construction zones.

What they do

  • Develop, implement and manage capital projects: goals, scopes, budgets, schedules; oversee progress and initiate solutions
  • Direct project managers, consultants, engineering firms, construction managers and contractors; assess their performance
  • Act as liaison between the assigned division and project teams; relay staff input and decisions; meet weekly with division management
  • Submit commission agenda items; occasionally serve as construction manager and inspect capital projects
  • Provide historical information on construction, operation and maintenance of treatment facilities to inform designs

What they measure

  • projects on budget and schedule
  • change orders
  • commission approvals on time
  • start-up issues at turnover
  • assets entered into CMMS at handover

Systems they use

  • project management and scheduling (MS Project, Primavera)
  • budget and contract management
  • document control and drawings
  • asset management handover (CMMS)
  • SCADA and process data for design basis

Certifications

  • project management certificate desired
  • Grade III+ wastewater operator, PE or mechanical technologist grade desirable
  • eight years' experience at a Class IV/V plant typical

Jobs to be done

  • See every project against plan weekly · Capital planningWhen I owe the division a weekly summary of activities, schedules and decisions across many projects, I want budget, schedule and open decisions rolled up per project, so I can report in minutes and escalate the ones slipping. BoardReport
  • Prioritise capital by compliance risk · ComplianceWhen the regulator and an engineering consultant are reprioritising projects with compliance as the primary determinant, I want each project tied to the permit risk and asset failures it removes, so I can defend the order and the schedule to the commission. ScorecardReport
  • Hand over a project the plant can run · MaintenanceWhen a project starts up, I want commissioning tests, O&M manuals, SCADA points and new assets loaded into the CMMS before turnover, so I can hand operations a system they can maintain from day one. ChecklistWorkflow

Pain points

  • The role regularly climbs ladders, enters process tanks through manways and occasionally permitted confined spaces, and walks construction zones. (heard in Silicon Valley Clean Water: Capital Improvement Program Manager job description (Nov 2024))
  • Jackson's three DWSRF loans each received the $500,000 subsidy cap; a 2022 refinance at zero percent over 40 years was estimated to save up to $20.3 million. (heard in EPA OIG 24-P-0038: Lack of State Financial Support and Local Capacity Prolonged Jackson, Mississippi Drinking Water Issues (May 13, 2024))
  • EPA OIG found the two Gowanus Canal CSO tanks about six and a half years behind the 2013 schedule, with estimated cost above $1 billion (over 1,300 percent above Region 2's original estimate); disagreements between New York City and EPA Region 2 were among the factors behind the delays and cost increases. (heard in EPA OIG Report 24-P-0029: Delay in Constructing CSO Tanks at the Gowanus Canal)
  • Richmond's aging bus tie, near end of life, was not selected for replacement in an ongoing switchgear and substation capital project; the critical UPS batteries were missing from the 2020 Condition Assessment Report, and the CIP document was not granular. (heard in SEH for VDH-ODW: Richmond Water Crisis Root Cause Analysis and Needs Assessment)
  • Electrical maintenance staff told Richmond's reviewers that the Panalarm wiring that once brought switchgear SG-6 alarms to a control room was abandoned during a previous project, leaving only local alarm indication. (heard in SEH for VDH-ODW: Richmond Water Crisis Root Cause Analysis and Needs Assessment)
  • Forum posters relaying news reports on Richmond's outage say the city issued RFPs in 2016 and 2021 to replace the roughly 25-year-old power transfer switch but did not proceed, and that procurement records showed the city knew of 'deteriorating' electrical equipment as far back as 2012. (heard in Richmond VA Boil Water Advisory (Eng-Tips))
  • Missouri's State Auditor found all four rate sufficiency studies since St. Louis's last water rate increase in 2011 recommended increases, but rates were not raised (the one proposal that reached a Board of Aldermen committee, in 2017, was voted down), so needed capital improvements were delayed and projected costs rose significantly. (heard in Missouri State Auditor Report 2022-116: City of St. Louis Department of Public Utilities)
  • The St. Louis Water Division, with about $349 million in capital assets, had not done a documented physical inventory as its policy requires, citing a shortage of employees; only 147 of about 841 city properties were metered. (heard in Missouri State Auditor Report 2022-116: City of St. Louis Department of Public Utilities)

Sources

More roles in utilities and critical process infrastructure

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this role with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Capital Improvement Program Manager”, PersonaDB, Mapped, https://rivet.mapped.com/personas/role/utilities-infrastructure/capital-improvement-program-manager