Manufacturing plants and industrial sites
Controls / Automation Engineer
Also posted as Controls Engineer, Automation Engineer, PLC Engineer, SCADA Engineer, Electrical Controls Engineer, Process Control Engineer, Instrumentation & Controls Engineer, Systems Integrator (external)
Designs, programs and supports PLC, HMI, SCADA, drives and networks on the plant floor; triages daily requests while delivering projects; is first- or second-line escalation when the line will not run. Owns the controls documentation, backups and (increasingly) ICS cybersecurity hygiene.
What they do
- Troubleshoot new or existing product problems involving designs, materials, or processes (O*NET Manufacturing Engineers)
- Triage daily controls requests so projects still get finished (controls engineer posting, via search)
- First-line PLC/SCADA troubleshooting with clear handover to process control engineering (via search)
- Maintain program backups, version control and tested recovery procedures for SCADA, historians and gateways (via search)
- Apply ISA/IEC 62443 and CISA mitigations: segment IT/OT, remove internet exposure, secure remote access, maintain manual operation (CISA, ISA)
What they measure
- controls-caused downtime
- backlog of controls requests
- program backup currency
- nuisance alarm rate
- projects delivered on time
- open ICS vulnerabilities
Systems they use
- Allen-Bradley / Rockwell, Siemens PLCs
- AVEVA InTouch, CitectSCADA, Ignition
- OPC-UA / Modbus / EtherNet/IP / S7 connectivity
- historians
- VFDs and motion
- version control for PLC programs
- ISA Automation Body of Knowledge
Certifications
- ISA CAP (Certified Automation Professional)
- ISA/IEC 62443 cybersecurity certificates
- vendor certifications (Rockwell, Siemens)
- BSc EE/ME
Jobs to be done
- Keep every controller backed up and versioned · IT and OTWhen a PLC or HMI dies or someone changes logic, I want to know the latest verified backup and who changed what, so I can restore in minutes and stop undocumented changes causing downtime. BoardAlertsWorkflow
- Get machine data out without rewiring the plant · IT and OTWhen production or quality asks for OEE or process data, I want to expose the PLC's run-state, counts and rates through OPC-UA/Modbus once, so every system reads the same machine truth instead of operators keying it in. Board3D view
- Cut nuisance alarms operators ignore · UptimeWhen HMI alarms flood, I want alarm frequency and standing-alarm analysis per line, so I can rationalise alarms and operators notice the one that matters. ReportBoard
- Plan obsolete controller replacement · Capital planningWhen controllers reach end of life, I want an inventory of PLC/HMI models, firmware, spares and vulnerability advisories, so I can sequence migrations by risk rather than after the last spare is gone. ReportBoard
Pain points
- Controls staff are interrupted by daily requests while expected to deliver projects (search summary of postings) (heard in O*NET 17-2112.03 Manufacturing Engineers)
- The Cyber Resilience Act is pushing machine makers toward software-defined control architectures, which plants will have to absorb (heard in Automation World front page (index))
- A PLCtalk poster on disabling PanelView alarms warns that too many insignificant alarms train operators to ignore the ones that matter. (heard in Disabling PanelView alarms (PLCtalk))
- In a 2026 PLCtalk thread asking what one thing people would improve about their plant's alarm system, answers cite alarm fatigue, nuisance alarms never resolved, and an OEM program that displayed only the first active alarm, so a critical alarm went unseen and product was scrapped. (heard in If you could improve one thing about your plant's alarm system (PLCtalk))
Sources
- O*NET 17-2112.03 Manufacturing Engineers
- O*NET 17-3023.00 Electrical and Electronic Engineering Technologists and Technicians
- CISA: Primary Mitigations to Reduce Cyber Threats to Operational Technology
- CISA Industrial Control Systems topic page
- ISA/IEC 62443 Series of Standards
- FlowFuse: OEE Is Misleading Your Factory
- Automation World: Why Industry 4.0 Still Hasn't Scaled
- Automation World front page (index)
- EU GMP Annex 1 Manufacture of Sterile Medicinal Products (2022)
- Quality Magazine: Retrofitting Machines to Improve Manufacturing Quality
- Reliable Plant front page (article index)
- Managing Alarm Overrides and Forced I/O in Modern HMI Systems (PLCtalk)
- Disabling PanelView alarms (PLCtalk)
- If you could improve one thing about your plant's alarm system (PLCtalk)
More roles in manufacturing plants and industrial sites
- Director of Manufacturing Operations / VP Operations
- Plant Manager
- Operations / Production Manager
- Production Supervisor
- Maintenance Manager
- Maintenance Supervisor
- Maintenance Planner / Scheduler
- Reliability Engineer
- Maintenance Technician (Mechanical / Multi-craft)
- Electrical / Instrumentation & Controls Technician
- Facilities Engineer / Facilities Manager (plant buildings and utilities)
- Utilities / Powerhouse Operator
- OT/IT Manufacturing Systems Engineer (MES, historian, plant network)
- Process Engineer
- Industrial Engineer
- Continuous Improvement / Lean / OpEx Manager
- Quality Manager
- EHS Manager / Safety Coordinator
- Industrial Hygienist
- Energy Manager (plant / ISO 50001)
- Environmental Compliance Manager / Engineer
- Plant Security Manager (and Security Officers)
- Tooling / Tool Room Lead (Tool & Die)
- Plant Materials / Warehouse Coordinator (plant-side)
- Sanitation Manager (food & beverage)
- Cleanroom / Fab Facilities Engineer (semiconductor)
- GMP Facilities / Utilities & Validation Engineer (pharma)
- Condition Monitoring / Predictive Maintenance (PdM) Technician
- Industrial Wastewater / Pretreatment Operator
Every kind of facility
- Airports
- Cross-cutting and portfolio roles
- Data center
- Education campuses
- Government, civic and public-safety buildings
- Hospitals and healthcare facilities
- Laboratories and life-science facilities
- Manufacturing plants and industrial sites
- Multifamily residential and rental housing
- Office buildings and corporate workplaces
- Retail, hospitality and venues
- Transit, terminals and parking
- Utilities and critical process infrastructure
- Warehouses and distribution centers