Manufacturing plants and industrial sites

Plant Materials / Warehouse Coordinator (plant-side)

Also posted as Materials Coordinator, Materials Planner, Production Planner/Scheduler, Inventory Control Specialist, Expeditor, Production Controller, Material Handler Lead, Logistics Coordinator, MRO Storeroom Coordinator, Parts Crib Attendant, Maintenance Tool Crib Attendant

See it in the graph

Keeps the line fed and the storeroom stocked: distributes work orders and schedules, revises schedules on shortages, expedites parts, requisitions materials and maintains inventory accuracy for both production materials and MRO spares. Forklift traffic between dock, warehouse and line runs through this role.

What they do

  • Distribute production schedules or work orders to departments (O*NET)
  • Revise production schedules when required due to design changes, labor or material shortages, backlogs (O*NET)
  • Arrange for delivery, assembly, or distribution of supplies or parts to expedite flow of materials (O*NET)
  • Requisition and maintain inventories of materials or supplies necessary to meet production demands (O*NET)
  • Review logistics performance against targets, benchmarks, and service agreements (O*NET Logisticians)

What they measure

  • line stoppages for material
  • inventory accuracy
  • stock-outs
  • expedite count and cost
  • dock-to-line time
  • MRO spares service level
  • Requisition fill rate
  • MRO inventory turns
  • Cycle count adjustments

Systems they use

  • ERP/MRP (SAP, QAD, Dynamics)
  • WMS
  • CMMS storeroom module
  • barcode/RFID scanning
  • Excel/Airtable
  • forklift fleet management (inferred)

Certifications

  • APICS CPIM/CSCP
  • forklift certification (OSHA 1910.178)

Jobs to be done

  • See material shortages before the line stops · ThroughputWhen a component is running short against the schedule, I want the alert hours ahead with alternatives and supplier ETA, so I can expedite or resequence before the line records a 'material wait' stop. AlertsBoard
  • Keep mro spares accurate for maintenance · MaintenanceWhen maintenance reserves parts for a planned job, I want storeroom stock, bin location and reservations accurate, so kitting works and technicians are not idle at the machine. WorkflowReport
  • Run dock and forklift traffic safely · SafetyWhen trucks and forklifts move through the plant, I want dock status, pedestrian zones and forklift incidents mapped, so I can route traffic and schedule deliveries to avoid the struck-by and dock-fall hazards OSHA lists. MapScheduleAlerts

Pain points

  • A managing partner at Net Results Group in a Plant Engineering Q&A (2024) lists not having the right part at the right time, missing or incomplete BOM parts lists, and excessive emergency orders and spot buys among causes of downtime. Treat as a claim. (heard in How maintenance trends are affecting and changing manufacturing facilities (Plant Engineering, 2024-04-03))
  • A Plant Engineering storeroom article (by a maintenance-materials consultant) reports technicians saying they cannot depend on the storeroom for the right parts, which the author ties to excess downtime and underused technicians; the usual root cause is an inaccurate equipment bill of materials driving what is stocked. (heard in A well-run storeroom preserves capital, saves time and money (Plant Engineering, 2013-06-27))
  • The same article says stockouts usually mean reorder points, min/max levels and safety stock no longer match maintenance needs, while obsolete and excess items tie up money and space because reliability engineers, planners and buyers are not part of stocking decisions. (heard in A well-run storeroom preserves capital, saves time and money (Plant Engineering, 2013-06-27))
  • Corrupted or inconsistent item data in the storeroom catalog increases search time, creates duplicate part numbers, delays purchase requests and causes ordering errors. (heard in A well-run storeroom preserves capital, saves time and money (Plant Engineering, 2013-06-27))
  • A maintenance poster on PLCtalk wants to stamp barcodes on equipment so technicians can pull up drawings and the machine's spare parts with their storeroom location, because finding them now costs technicians a lot of time. (heard in Creating barcodes to scan to access drawings and spare parts (PLCtalk))
  • Controls people on PLCtalk say technicians stash spare parts inside control panels across the plant, so the company pays for redundant stock outside the crib, nobody knows what is stored where, used spares are not replenished, and aging parts such as power supplies may be dead when finally needed. (heard in Control Panel Hygiene (PLCtalk))

Sources

More roles in manufacturing plants and industrial sites

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this role with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Plant Materials / Warehouse Coordinator (plant-side)”, PersonaDB, Mapped, https://rivet.mapped.com/personas/role/manufacturing/plant-materials-coordinator