Manufacturing plants and industrial sites

Industrial Engineer

Also posted as IE, Manufacturing Systems Engineer, Operations Engineer, Methods Engineer, Capacity Planner, Facilities Layout Engineer, Lean Engineer, Continuous Improvement Engineer, Plant Engineer

See it in the graph

Balances time, people, space and equipment: time studies, line balancing, layouts, standards, capacity and cost models. Collects process data by observation and increasingly from MES/PLC, and recommends how to use personnel, material and utilities better.

What they do

  • Collect data on processes and production through observations of work activities, time studies, and staff surveys (BLS)
  • Plan and establish sequence of operations to fabricate and assemble parts or products and to promote efficient utilization (O*NET)
  • Recommend methods for improving utilization of personnel, material, and utilities (O*NET)
  • Estimate production costs, cost saving methods, and the effects of product design changes (O*NET)
  • Design processes, systems, or enhancements to maximize productivity, efficiency, or space (BLS)

What they measure

  • labour productivity (units/hour)
  • line balance efficiency
  • capacity utilisation
  • space utilisation
  • standard time accuracy
  • cost per unit
  • Labor efficiency % of standard
  • PF&D allowance %

Systems they use

  • ProModel / simulation
  • MES/ERP (SAP, MRP)
  • AutoCAD layouts
  • Minitab
  • Excel/SQL/Python
  • WMS
  • SCADA/HMI for data
  • MATLAB
  • ProModel
  • Microsoft Visio
  • SAP ERP
  • MRP / production scheduling software
  • Warehouse management system (WMS)
  • Allen-Bradley PanelView HMI

Certifications

  • BSc IE
  • Lean Six Sigma Green/Black Belt
  • APICS CPIM

Jobs to be done

Pain points

  • IE postings overlap with Facilities Engineer and Plant Engineer titles, so the same person often owns layout, utilities and methods (heard in O*NET 17-2112.00 Industrial Engineers)
  • An automotive process engineer on Eng-Tips says the floor never reaches the volume a time study predicts; respondents say about 85% of standard has become a de facto rule of thumb, but there is no industry standard and it is hard to explain to management, especially in distribution centers where cycles vary more. (heard in Time Study V Actual Production (Eng-Tips, Manufacturing Plant engineering forum))
  • A veteran industrial engineer on the same thread says he has seen operators verbally bashed and some fired because of sloppy time standards, so accuracy, element-level detail and documentation of studies matter; others note efficiency above 85% usually means the standard is wrong or the method changed. (heard in Time Study V Actual Production (Eng-Tips, Manufacturing Plant engineering forum))

Sources

More roles in manufacturing plants and industrial sites

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this role with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Industrial Engineer”, PersonaDB, Mapped, https://rivet.mapped.com/personas/role/manufacturing/industrial-engineer