Maintenance Planner / Scheduler

Also posted as Maintenance Planner, Maintenance Scheduler, Work Control Planner, Shutdown/Turnaround Planner, Master Scheduler Planner, Planning & Scheduling Coordinator

See it in the graph

Turns approved work requests into executable jobs: scope, steps, labour estimate, parts kitted, permits and LOTO, then builds the weekly and daily schedule with supervisors and production. A ratio of about one planner per 20 technicians is the cited starting point. Lives in the CMMS and in spreadsheets when the CMMS cannot schedule.

What they do

  • Develop detailed job plans for corrective, preventive, and predictive maintenance work orders (JD template)
  • Secure parts, materials, tools and equipment before work orders go to the field (JD template)
  • Keep a backlog of planned, parts-ready work so technicians always have productive tasks (JD template)
  • Build and publish weekly and daily schedules with the Maintenance Supervisor, balancing planned work, emergencies, and production windows (JD template)
  • Plan outages and shutdowns: multi-craft sequencing, contractor coordination, critical path (JD template)
  • Monitor schedule compliance and wrench time, report trends (JD template)

What they measure

  • schedule compliance %
  • planned work %
  • backlog in crew-weeks (planned vs ready)
  • kitting rate
  • estimate accuracy (actual vs estimated hours)
  • PM compliance
  • wrench time (diagnostic)
  • Schedule compliance
  • Break-in (urgent) work share

Systems they use

  • CMMS/EAM (SAP PM, Maximo, Infor EAM, Fiix, UpKeep)
  • ERP inventory and purchasing (SAP, Oracle)
  • Excel/Google Sheets
  • MS Project / Primavera P6 for shutdowns
  • P&IDs, schematics, equipment manuals

Certifications

  • SMRP CMRP (preferred)
  • associate degree or technical certificate in industrial maintenance

Standards they work to

  • SMRP metric 5.4.14 (PM and PdM Compliance): PM/PdM work orders completed by due date divided by those due, with a defined on-time window; best-in-class target is above 90%.

Jobs to be done

  • See the backlog by stage and age · MaintenanceWhen I review the backlog, I want work split into pending requests, approved, planned and ready-to-schedule with count and aging for each, so I can see where planning is the bottleneck rather than reporting one misleading backlog number. BoardReport
  • Schedule against real production windows · MaintenanceWhen I build next week's schedule, I want production's planned stops, changeovers and sanitation windows alongside my ready work and crew availability, so I can place jobs where the equipment will actually be free and stop planned work slipping. ScheduleWorkflow
  • Kit parts before the job · MaintenanceWhen a job is scheduled, I want to know parts are picked, staged and the reservation matches the BOM, so technicians do not idle or improvise at the machine. WorkflowAlerts
  • Plan a shutdown on a critical path · MaintenanceWhen a plant shutdown is approved, I want every job, craft, contractor and permit on one critical-path plan with live progress, so I can bring the plant back on time and show what slipped and why. ScheduleBoardReport
  • Measure planning not people · MaintenanceWhen leadership asks for wrench time, I want schedule compliance, planned-vs-reactive, backlog and rework from the CMMS instead, so I can show organisational efficiency without a punitive stopwatch study. ScorecardReport

Pain points

  • 'Your staff inevitably turns to spreadsheets and other workarounds outside the system.' (heard in Plant Engineering: Nine reasons your facilities maintenance planning and scheduling effort isn't giving you the benefits you expect (Steve Mueller))
  • Planners cannot build job plans from vague descriptions; planners are 'building the operational memory of the plant' (heard in Reliability Magazine: The CMMS isn't broken, your inputs are)
  • 'Purchasing, admin, and reporting tasks dilute the planning role' (heard in Maintenance Planner/Scheduler job description template)
  • The same article names ways PM compliance gets distorted: auto-closing overdue work orders, inaccurate completion dates and back-dating, plus loosened on-time windows that make a rising rate a definition change. (heard in PM Compliance Rate Benchmarks: Is 90% the Right Target? (Reliable magazine, undated))

Sources

More roles in manufacturing plants and industrial sites

Every kind of facility

Every job category

See it in the graphAll of PersonaDBBuild an app for this role with Rivet

From PersonaDB, Mapped’s directory of who works in a facility and what they’re trying to get done. Every sourced entry links to the page it came from. PersonaDB’s words are free to reuse under CC BY 4.0 with credit to Mapped; the pages it cites keep their own terms. Cite as: “Maintenance Planner / Scheduler”, PersonaDB, Mapped, https://rivet.mapped.com/personas/role/manufacturing/maintenance-planner-scheduler